1
/
of
7
Vesgantti
Vesgantti Modular Sofa Bed with Storage, 92" Sleeper Sofas with 9 Seats Storage Chaises Removable Cover, Luxury Large Velvet Sectional Couch Set for Living Room, Apartment, Home Theater, Blue
Vesgantti Modular Sofa Bed with Storage, 92" Sleeper Sofas with 9 Seats Storage Chaises Removable Cover, Luxury Large Velvet Sectional Couch Set for Living Room, Apartment, Home Theater, Blue
Regular price
$1,999.99 USD
Regular price
$1,999.99 USD
Sale price
$1,999.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Brand: Vesgantti
Color: Blue
Features:
- MODULAR SPACE-SAVING SECTIONAL SOFA – The Vesgantti modular sofa features a full modular design with a clean modern aesthetic, ideal for apartments, condos, studios, offices, basements, and family rooms. It can be freely reconfigured into a living room couch, sofa bed, U-shaped sectional, or corner sofa to fit different layouts and lifestyles. Overall dimensions: 91.7”W x 86.4”L x 26.8”H, making it a versatile centerpiece for small to medium living spaces
- CUSTOMIZABLE COMFORT WITH ADJUSTABLE ERGONOMICS – Vesgantti sleeper sofa is engineered for personalized comfort, featuring a generous 27–54 inch adjustable seat depth with soft cushions and high-density memory foam for ergonomic support. Human-centered design allows the backrest and armrest to be adjusted to multiple angles, offering flexible lounging, sitting, and reclining positions. Designed for everyday comfort in small-space living without compromising support
- HIDDEN STORAGE DESIGN FOR SPACE EFFICIENCY – Practicality is enhanced with built-in storage compartments under each seat and ottoman, helping maximize space in compact homes. Each compartment measures 23.4"L x 23.4"W x 6.7"H and includes a detachable partition with wide-opening access, making it easy to store and organize blankets, pillows, clothing, toys, and daily essentials while keeping your living space clutter-free
- MODULAR EASY ASSEMBLY & FLEXIBLE CONFIGURATION – The deep seat modular sectional sofa features a modular design for simple assembly and flexible reconfiguration to fit your space needs. The sofa arrives in 7 packages (may arrive separately) with all necessary tools and clear instructions included for setup in about one hour. Two leg height options (2.76" & 4.72") allow you to create a low modern profile or extra clearance for convenient robot vacuum cleaning
- DURABLE CONSTRUCTION & PREMIUM PET-FRIENDLY FABRIC – Built with a reinforced FSC-certified hardwood frame, this sectional storage couch ensures long-lasting stability, strength, and shape retention. Upholstered in premium velvet fabric, it is soft, skin-friendly, and designed to be scratch-resistant, durable, and pet-friendly while helping conceal everyday marks and wear. Backed by a dedicated customer service team for reliable post-purchase support
model number: Velvet Exper
Part Number: Velvet Exper
EAN: 0840452643932
Package Dimensions: 27.6 x 27.6 x 20.1 inches
Share
